Sandblasted old cage. Ready for epoxy primer

Ready for epoxy primer.

Fab'ing horizontal stabilizer

Fab'ing vertical stab in place on boom tube.

Mounting gussets fab'ed.

Vertical stabilizer almost complete.

Pair of elevators hanging out of the way.

Elevator on the bench.

Finishing up the internal bracing on the horizontal stabilizers.

Cage primed on temporarily on the old legs and wheels.

Building flaperons...using Slingshot dimensions.

Drilling all fabric rivet holes in ribs on the bench...BIG time saver. Still nothing fun about drilling 280 holes in one run. Can you say "C R A M P"?

Lamar helping out with installing the H-sections in the spars.

Wings basically framed together.

Working through several mods. Progress being made.

Slingshot-like canopy in progress.

Where the canopy line will be